Local. Safe. Fully insured.
Demolition in Hampshire

Demolition contractors
for Hampshire
We take on homes, garages, commercial and industrial buildings across Hampshire. Every job starts with a free site survey and a written quote, and we prepare the Section 80 notice, method statement and waste management plan for you. Waste is sorted and over 90% of materials are recovered and reused.
- Free site survey and written quote
- Section 80 notice, method statement and waste management plan prepared for you
- Fully insured, with RAMS on every job
- Over 90% of materials recovered and reused
- Available seven days a week, including urgent and short-notice work
Our services in Hampshire
-
Full demolition
Houses, bungalows and commercial buildings taken down and the site left clean, compliant and ready for what comes next.
About our demolition service -
Partial demolition
Extensions and other parts of a building removed while the structure that stays is protected.
Read our partial demolition guide -
Garage demolition
Concrete and brick garages taken down, with the base removed if you want the space cleared.
About garage demolition -
Soft strip
Fixtures, fittings and non-structural elements removed ahead of a refurbishment or a demolition.
About our soft strip service -
Site clearance
Waste, vegetation, hardstanding and contaminated soil removed, and the ground levelled.
About our site clearance service -
Salvage
Bricks, tiles, timber and fittings worth reusing are reclaimed, and their value is reflected in our quote.
About our salvage service
Working in Hampshire
-
Notices to the right council
Section 80 notices go to the council for the area: New Forest District Council for Ringwood, Fordingbridge, New Milton and Lymington, Test Valley Borough Council for Romsey, and Southampton City Council for Southampton. We prepare and submit the notice for you.
-
The New Forest National Park
Inside the New Forest National Park, the National Park Authority deals with planning, and demolition in one of its conservation areas can need planning permission. Check with them early if your site is in the Park.
-
Close to our base
Ringwood and Fordingbridge are just across the county border from our base at Three Legged Cross, so we can visit quickly and often fit in short-notice work.
Recent project:
Lymington
On a residential project in Lymington, we crushed brick and concrete rubble on site with a mobile crusher, so it could be reused rather than taken away as waste. It's one of the ways we recover and reuse over 90% of materials.

How a demolition project works
-
Free site survey
We visit the site to look at the building, the access and the neighbouring properties, and talk through what you need.
-
Written quote
You get a clear written quote. If the building holds materials worth reclaiming, that value is reflected in the price.
-
Notices and paperwork
We prepare and submit the Section 80 notice, method statement and waste management plan, and provide RAMS before work starts.
-
Soft strip and salvage
Fixtures, fittings and reusable features come out first, and bricks, timber, slate and tiles are set aside wherever they can be reclaimed.
-
Demolition
The structure comes down in a planned sequence, with the site kept safe for neighbours and the public throughout.
-
Clearance and recycling
Waste is sorted and over 90% of materials are recovered and reused. We leave the site clear and ready for the next stage.
Questions about demolition in Hampshire
Which parts of Hampshire do you cover?
We work across Hampshire, including Ringwood, Fordingbridge, New Milton, Lymington, Totton, Romsey and Southampton, as well as Dorset and Wiltshire.
Who do I send a Section 80 notice to in Hampshire?
It goes to the council for the area the building is in, such as New Forest District Council, Test Valley Borough Council or Southampton City Council. Most demolitions need the notice at least six weeks before work starts, and we prepare and submit it as part of the job.
Do you take on commercial projects in Hampshire?
Yes. We take on commercial and industrial demolition and strip-outs as well as residential work, and every job is fully insured with RAMS provided.
Can you clear the site after the demolition?
Yes. Bases and hardstanding can be broken out, waste and vegetation removed, and the ground levelled and graded ready for building.
How soon can you start?
We're available seven days a week and can often fit in urgent or short-notice work, especially close to our base around Ringwood and Fordingbridge. Where a Section 80 notice is needed, work can't start until the council has responded or six weeks have passed.